Fixed-scope qualification path

Find the likely binding infrastructure constraint before it strands schedule or capital.

The ORBIT Large-Load Site Constraint Screen is a bounded, evidence-first review for one site and one live decision. It compares power, onsite electrical capacity, cooling, water, wastewater, schedule and economics on a common basis and makes uncertainty explicit.

Qualification

Good fit when the decision is bounded enough to analyze responsibly.

No sales call is required to determine basic fit. If the project falls outside the fixed scope, Trusta will not force it through a standard checkout.

Usually a fixed-scope fit

  • One site / parcel / facility or one clearly bounded expansion
  • One decision horizon and one primary decision question
  • Approx. 5–100 MW proposed or incremental load, or comparable industrial utility intensity
  • Existing evidence can be supplied for relevant utilities and onsite systems
  • No engineering stamp, permit approval, utility commitment or legal opinion is being purchased
  • The objective is constraint ranking, sequencing, evidence gaps and decision support

Needs custom written scope instead

  • Multi-site portfolio optimization as the initial scope
  • Detailed design, sealed drawings, construction documents or utility interconnection application
  • Regulated certification, statutory compliance determination or formal M&V assurance
  • Highly sensitive / export-controlled / classified information through public channels
  • Missing basic site/load evidence such that the task is primarily original field investigation
  • Production software integration, continuous monitoring or enterprise identity/security deployment
Fixed base scope

One site. One decision. Existing evidence first.

$7,500
base fixed-scope price when qualification criteria are met

Constraint map

Cross-utility capacity/load baseline, dependencies, likely binding constraints and usable headroom where evidence supports it.

Evidence + assumptions

Source register, customer-stated inputs, modeled values, unknowns, comparison-basis checks and what would change the conclusion.

Decision package

Base/alternative scenario comparison, timing implications, CAPEX/OPEX where supportable, ranked actions and next validation steps.

Typical required inputs

  • Site / parcel and proposed load phasing
  • Utility service / queue / interconnection information
  • Onsite electrical one-lines or equipment capacity basis
  • Cooling architecture and thermal assumptions
  • Water source, demand basis and allocation limits where material
  • Wastewater / pretreatment / discharge basis where material
  • Known schedule commitments and decision deadline
  • Any current alternatives already under consideration
Customer path

Qualification → hosted invoice → secure intake → reviewed delivery.

Stripe is used after scope fit is confirmed. This prevents an out-of-scope buyer from paying for a standard service that cannot responsibly deliver the requested outcome.

1 · Readiness

Run the free ORBIT Evidence Readiness Assessment.

2 · Qualify

Confirm one-site / one-decision scope and required evidence.

3 · Pay

Trusta issues a Stripe-hosted invoice for the accepted fixed scope.

4 · Deliver

Secure intake, evidence-aware analysis, QA and versioned decision artifact.

Target turnaround is generally five business days after payment and sufficiently usable intake/evidence. Missing critical evidence pauses the delivery clock rather than forcing false precision.

Start without a meeting

Run readiness first. If the score and scope fit, request the fixed-scope invoice in writing.

Do not include confidential files in the email. Secure evidence upload is opened after an accepted order is created.